Wednesday, November 30, 2011

Resupply


Unloading
 A veiw of the Aurora will on fuel line watch at about 2am in the morning,

 Clocking on at 4am in the morning dureing refuelling to discover the booster pump pipework had failed and split  due to a blockage caused by ice in the pipeline. The pump was shut down and fuel contained in the tray of the pump houseing. We by- passed the pump and let the main pumps on the boat do all the work to get the job done.

A nother shot of the ship

No comments:

Post a Comment